午夜91精品视频国产_欧美日韩中文字幕综合小说_国产欧美在线观看精品_免费观看黄a一级视频_精品视频一区99_清纯唯美激情亚洲综合_左手影院日本高清完整版免费_亚洲岛国成人在线_欧美综合网五月天_05后学生自慰网站

News

Phone: +86-13356762078

Fax: +86-536-6057366 

E-mail: zcatjx@163.com

Company News

Company News

Your Current Location : Home News Company News

Shrinking machine is usually what causes the slow warming?

Heat shrink machine is slow or unable to rise to a higher temperature (above 160 degrees Celsius) What is the reason?
Line heater is the main power line through a magnetic switch and then to electric suction pipe, it should be sucked magnetic switch detects the contacts are normal. If the line does not pass one of the phases, the above phenomenon occurs. If suction magnetic switch normal, then check the meter to see if the machine each phase ohmic values are the same. If the normal should be shorted. If all phases are turned on but still abnormal line or heating pipes, replace the heater.

Return

Copyright:@2008-2012Aetna Zhucheng Machinery Co., Ltd.   Information Miibenan: Lu ICP 09012435
Adress:Eastern City Industrial District, Mizhou street, Zhucheng City, Shandong Province  Fax:+86-536-6057366   

Mobile phone: +86-15376682788  E-mail: zcatjx@163.com  Technical support: HENGTAI Internet我要啦免費(fèi)統(tǒng)計(jì)